When would I need a Structural Engineer?

It is recommended to engage with a structural engineer as well as an architect at building control design stage, well ahead of construction. In other cases, particularly for new builds or basement conversions, a structural engineer might be required to carry out a feasibility study before submitting a planning application. The architect can also advise the client on when a structural engineer is required.

Leave a Reply

Your email address will not be published. Required fields are marked *