107-109 Hammersmith Grove

Brief and project type

Finished refurbishment project. Proposed office space consisting of double storey rear extension to existing mixed use building.

Materials

Reinforced concrete, masonry, steel, glass, timber

Details

The scheme involved creation of double storey rear extension with extensive glazed features. Structures Made Easy Ltd was approached by client to design both sub and super structure of the proposed building. Design details included underpinning of rear boundary walls and design of retaining walls and continuous strip foundations to create the base supporting proposed building. The super structure consisted of main steel skeleton and load bearing masonry to construct the shell and support the floors and the roof.

<< View featured Structures projects
Contact

Call our fastline on: Tel1: +44 (0) 7525 047778 Tel2: +44 (0) 7757 301365

Email us on: support@structures-made-easy.co.uk